COLUMBUS, Ind. — Work on the State Street bridge will shift to the eastbound side on Friday. The restriction includes the closure of the intersection of Stadler Drive and State Street and is expected to last until the end of May.
This phase includes a 6-foot walk path on the eastbound side of the bridge, new lighting, and a 54-inch tall bridge railing system. Cost for the work is estimated at $4 million.